Rand Water Vereeniging pump station 5000 m² paved area with drainage 2007

Right hand side and left hand side level and compaction 5000 m²

MRMSCivilContractorsRandWaterVereenigingPumpStation

Right hand side and left hand side level and compaction 5000 m² (above & below)

MRMSCivilContractorsRandWaterVereenigingPumpStaCompaction

Final stage of level and compaction 2500 m²

MRMSCivilContractorsRandWaterVereenigingPumpStaFinalCompaction

Slotted drainage on lowest area

MRMSCivilContractorsRandWaterVereenigingSlottedDrainage

Compacted area 98 % mod ashto

MRMSCivilContractorsRandWaterVereenigingPumpStaCompactedArea

Excavation of drainage pipe 600 mm

MRMSCivilContractorsRandWaterVereenigingDrainagePipe

Excavation levels

MRMSCivilContractorsRandWaterExcavationLevels

Excavation of levelsMRMSCivilContractorsRandWaterVereenigingExcavationofLevels

Compaction area and the instalation of a plastic layer.

MRMSCivilContractorsRandWaterVereenigingCompactionArea

Filing sand for paving.

MRMSCivilContractorsRandWaterVereenigingFilingSandForPaving

Final paved area.

MRMSCivilContractorsRandWaterVereenigingFinalPavedArea

The total project took 6 months to complete and with a total of 5000 m ² paved with inter lock paving block 80 mm.  The total area whas compacted to 98 % mod aashto with drainage system.